DWA Architects

Services Supplied on this Project:

  • Phase I desk study
  • A site walkover survey of the site, set-out and supervision of the field works
  • Window sampling
  • Cable percussive boreholes
  • Groundwater monitoring standpipes
  • Gas and groundwater monitoring
  • Geotechnical testing
  • Chemical analysis of soil samples
  • The provision of an interpretive report including a desk study and an assessment of environmental issues pertaining to the site and its redevelopment

Project Details:

Sector:
Value:
Date:

Healthcare Development
Approximately 6k
2009 – 2012